IAC logo
IAC Assessment: SF0314
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0314
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product raisins
NAICS 311423 - Dried and Dehydrated Food Manufacturing
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 39,000
Annual Production 20,000 Tons
Production Hrs. Annual 3,336
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,370 1,779,211 kWh $0.09
Electricity Demand $60,804 5,927 kW-months/year $10.26
Natural Gas $50,567 5,718 MMBtu $8.84
TOTAL ENERGY COSTS $268,741
RECOMMENDED SAVINGS* $51,632 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,177
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$4,353
Cost:
-
- - - - $4,353 575 - - -
-
kWh
-
-
kW-months/year
$4,353
575
MMBtu
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$6,788
Cost:
-
- - - - $6,788 148 - - -
-
kWh
-
-
kW-months/year
$6,788
148
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$258
Cost:
-
$258 6,229 - - - - - - $258
6,229
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,926
Cost:
$807
- - - - $1,926 226 - - -
-
kWh
-
-
kW-months/year
$1,926
226
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,186
Cost:
$14,112
$7,162 79,995 $3,024 282 - - - - $7,162
79,995
kWh
$3,024
282
kW-months/year
-
-
MMBtu
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$20,484
Cost:
$30,250
- - - - - - $20,484 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,484
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,127
Cost:
$2,564
$554 6,139 $573 53 - - - - $554
6,139
kWh
$573
53
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,436
Cost:
$5,848
$1,566 17,492 $870 81 - - - - $1,566
17,492
kWh
$870
81
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,342
Cost:
$4,848
$576 6,438 $766 71 - - - - $576
6,438
kWh
$766
71
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$447
Cost:
$2,408
$447 4,998 - - - - - - $447
4,998
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
11: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$2,285
Cost:
-
- - - - - - $2,285 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,285
-
$
TOTAL RECOMMENDED Savings:
$51,632
Cost:
$60,837
$10,563 121,291 $5,233 487 $13,067 949 $22,769 - $10,563
121,291
kWh
$5,233
487
kW-months/year
$13,067
949
MMBtu
$22,769
-
$
TOTAL IMPLEMENTED Savings:
$15,177
Cost:
$10,696
$2,400 30,159 $1,636 152 $11,141 723 - - $2,400
30,159
kWh
$1,636
152
kW-months/year
$11,141
723
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost