IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

424

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0450 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,096 $2,000 Implemented
UD0450 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,103 $2,000 Implemented
UD0450 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,449 $10,000 Not Implemented
UD0450 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $980 $250 Not Implemented
UD0450 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,370 $2,500 Not Implemented
UD0450 # 07 Y:1995 07 1995 METER WASTE WATER $61,699 $2,000 Implemented
UD0450 # 08 Y:1995 08 1995 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $24,424 $0 Not Implemented
UD0450 # 09 Y:1995 09 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,319 $0 Not Implemented
WI0224 # 01 Y:1994 01 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,194 $20,000 n/a
WI0224 # 02 Y:1994 02 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,980 $15,000 n/a
WI0224 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,846 $500 n/a
WI0224 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,264 $964 n/a
WI0224 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $272 $0 n/a
WI0224 # 06 Y:1994 06 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,033 $0 n/a
OD0006 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $4,164 $1,700 Not Implemented
OD0006 # 02 Y:1994 02 1994 MINIMIZE WATER USAGE $9,575 $1,920 Not Implemented
OD0006 # 03 Y:1994 03 1994 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $190 $170 Implemented
OD0006 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $420 $380 Implemented
OD0006 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $887 $1,612 Implemented
OD0006 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,771 $6,574 Implemented
NV0003 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,929 $129 Not Implemented
NV0003 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $920 $180 Not Implemented
NV0003 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,340 $230 Not Implemented
NV0003 # 04 Y:1994 04 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,818 $2,000 Not Implemented
WI0127 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,052 $15,000 Not Implemented