IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0578 # 10 Y:1999 10 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,140 $0 Not Implemented
UD0578 # 09 Y:1999 09 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,220 $230 Not Implemented
UD0578 # 08 Y:1999 08 1999 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,734 $13,000 Not Implemented
UD0578 # 07 Y:1999 07 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,939 $6,750 Not Implemented
UD0578 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,242 $0 Implemented
UD0578 # 05 Y:1999 05 1999 USE POWER DURING OFF-PEAK PERIODS $8,867 $0 Not Implemented
UD0578 # 04 Y:1999 04 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $17,671 $3,000 Implemented
UD0578 # 03 Y:1999 03 1999 $19,500 $8,600 Implemented
UD0578 # 02 Y:1999 02 1999 $26,052 $0 Not Implemented
UD0578 # 01 Y:1999 01 1999 $323,997 $26,940 Implemented
UD0450 # 08 Y:1995 08 1995 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $24,424 $0 Not Implemented
UD0450 # 09 Y:1995 09 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,319 $0 Not Implemented
UD0450 # 07 Y:1995 07 1995 METER WASTE WATER $61,699 $2,000 Implemented
UD0450 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,370 $2,500 Not Implemented
UD0450 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $980 $250 Not Implemented
UD0450 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,449 $10,000 Not Implemented
UD0450 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,103 $2,000 Implemented
UD0450 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,096 $2,000 Implemented
UD0450 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,163 $0 Implemented
UD0127 # 01 Y:1984 01 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,316 $1,000 Implemented
UD0127 # 04 Y:1984 04 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79 $83 Implemented
UD0127 # 03 Y:1984 03 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,348 $15,950 Implemented
UD0127 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,943 $10,634 Implemented