IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0394 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,893 $37,992 Not Implemented
UM0394 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $6,227 $12,120 Not Implemented
UM0394 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $4,589 $3,850 Not Implemented
UM0394 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $200 Implemented
UM0394 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $1,971 $2,584 Implemented
UM0394 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,811 $5,000 Not Implemented
UM0394 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,389 $1,350 Not Implemented
UM0394 # 08 Y:2011 08 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $180 $10 Not Implemented
UM0394 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,902 $10,000 Not Implemented
UM0092 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,141 $4,497 Not Implemented
UM0092 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $29,553 Not Implemented
UM0092 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $696 $1,000 Not Implemented
UM0092 # 04 Y:1997 04 1997 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $35,249 $8,500 Not Implemented
UM0092 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $1,392 $5,361 Not Implemented
UM0092 # 06 Y:1997 06 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $245,000 $10,000 Not Implemented
UM0092 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,512 $300 Not Implemented