Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2037 | Frozen Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0228 # 02 Y:1997 | 02 | 1997 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $14,209 | $23,600 | Not Implemented |
ME0228 # 03 Y:1997 | 03 | 1997 | REPAIR AND ELIMINATE STEAM LEAKS | $5,656 | $857 | Implemented |
ME0228 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,459 | $10,908 | Implemented |
ME0228 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,340 | $2,721 | Implemented |
ME0228 # 06 Y:1997 | 06 | 1997 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,664 | $0 | Implemented |
ME0228 # 07 Y:1997 | 07 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,710 | $300 | Implemented |
ME0228 # 08 Y:1997 | 08 | 1997 | MINIMIZE WATER USAGE | $6,304 | $19,800 | Implemented |
ME0228 # 09 Y:1997 | 09 | 1997 | MINIMIZE WATER USAGE | $1,949 | $232 | Implemented |
ME0228 # 01 Y:1997 | 01 | 1997 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $58,961 | $46,000 | Implemented |
UM0092 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,512 | $300 | Not Implemented |
UM0092 # 06 Y:1997 | 06 | 1997 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $245,000 | $10,000 | Not Implemented |
UM0092 # 05 Y:1997 | 05 | 1997 | INSULATE BARE EQUIPMENT | $1,392 | $5,361 | Not Implemented |
UM0092 # 04 Y:1997 | 04 | 1997 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $35,249 | $8,500 | Not Implemented |
UM0092 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $696 | $1,000 | Not Implemented |
UM0092 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,616 | $29,553 | Not Implemented |
UM0092 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,141 | $4,497 | Not Implemented |
SF0117 # 08 Y:1997 | 08 | 1997 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,173 | $150 | Implemented |
SF0117 # 09 Y:1997 | 09 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $224,640 | $200,000 | Not Implemented |
SF0117 # 07 Y:1997 | 07 | 1997 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,025 | $150 | Implemented |
SF0117 # 06 Y:1997 | 06 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,499 | $0 | Not Implemented |
SF0117 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,308 | $4,020 | Not Implemented |
SF0117 # 04 Y:1997 | 04 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,213 | $819 | Implemented |
SF0117 # 03 Y:1997 | 03 | 1997 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $124,200 | $18,900 | Not Implemented |
SF0117 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,008 | $1,021 | Implemented |
SF0117 # 01 Y:1997 | 01 | 1997 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,796 | $8,000 | Not Implemented |