Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 2038 | Frozen Specialties, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0127 # 02 Y:2014 | 02 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,800 | $2,100 | Not Implemented |
DL0127 # 12 Y:2014 | 12 | 2014 | INSTALL OCCUPANCY SENSORS | $3,400 | $2,300 | Implemented |
DL0127 # 11 Y:2014 | 11 | 2014 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,900 | $5,200 | Not Implemented |
DL0127 # 10 Y:2014 | 10 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,900 | $3,200 | Not Implemented |
DL0127 # 09 Y:2014 | 09 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,800 | $250 | Implemented |
DL0127 # 08 Y:2014 | 08 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,900 | $13,000 | Not Implemented |
DL0127 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,400 | $2,100 | Not Implemented |
DL0127 # 05 Y:2014 | 05 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,000 | $50 | Not Implemented |
DL0127 # 04 Y:2014 | 04 | 2014 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $1,200 | $1,800 | Not Implemented |
DL0127 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,300 | $100 | Not Implemented |
DL0127 # 01 Y:2014 | 01 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,800 | $100 | Implemented |
DL0127 # 07 Y:2014 | 07 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $15,300 | $5,700 | Not Implemented |
HO0155 # 11 Y:1997 | 11 | 1997 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $9,500 | $100 | Implemented |
HO0155 # 10 Y:1997 | 10 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,000 | $500 | Implemented |
HO0155 # 09 Y:1997 | 09 | 1997 | USE HIGH PRESSURE WASH SYSTEMS | $33,480 | $1,000 | Not Implemented |
HO0155 # 08 Y:1997 | 08 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $5,460 | $25,000 | Implemented |
HO0155 # 07 Y:1997 | 07 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,263 | $1,363 | Implemented |
HO0155 # 06 Y:1997 | 06 | 1997 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,462 | $6,000 | Not Implemented |
HO0155 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,141 | $2,400 | Not Implemented |
HO0155 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,298 | $15,334 | Not Implemented |
HO0155 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,556 | $1,000 | Implemented |
HO0155 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,489 | $1,607 | Implemented |
HO0155 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,138 | $9,401 | Not Implemented |