Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0549 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,549 | $0 | Implemented |
WV0549 # 01 Y:2017 | 01 | 2017 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,748 | $105,000 | Not Implemented |
WV0549 # 17 Y:2017 | 17 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $286 | $1,075 | Implemented |
WV0549 # 16 Y:2017 | 16 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $308 | $20 | Implemented |
WV0549 # 15 Y:2017 | 15 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $527 | $2,000 | Implemented |
WV0549 # 14 Y:2017 | 14 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,016 | $582 | Implemented |
WV0549 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,249 | $75 | Implemented |
WV0549 # 12 Y:2017 | 12 | 2017 | MINIMIZE WATER USAGE | $1,517 | $1,050 | Not Implemented |
WV0549 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $2,345 | $6,890 | Implemented |
WV0549 # 11 Y:2017 | 11 | 2017 | INSTALL STEAM TRAP | $1,534 | $1,380 | Not Implemented |
WV0549 # 03 Y:2017 | 03 | 2017 | USE PHOTOCELL CONTROLS | $4,781 | $0 | Implemented |
WV0549 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,680 | $500 | Implemented |
WV0549 # 05 Y:2017 | 05 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,241 | $1,000 | Implemented |
WV0549 # 08 Y:2017 | 08 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,180 | $4,272 | Not Implemented |
WV0549 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,263 | $11,180 | Implemented |
WV0549 # 09 Y:2017 | 09 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,755 | $0 | Implemented |
WV0549 # 06 Y:2017 | 06 | 2017 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $2,823 | $11,000 | Not Implemented |
UD0720 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,200 | $225 | Implemented |
UD0720 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,757 | $3,200 | Implemented |
UD0720 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,870 | $6,000 | Implemented |
UD0720 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,769 | $0 | Implemented |
UD0720 # 12 Y:2005 | 12 | 2005 | INSULATE BARE EQUIPMENT | $483 | $379 | Not Implemented |
UD0720 # 14 Y:2005 | 14 | 2005 | USE PHOTOCELL CONTROLS | $296 | $500 | Not Implemented |
UD0720 # 15 Y:2005 | 15 | 2005 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $200 | $340 | Implemented |
UD0720 # 01 Y:2005 | 01 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $6,931 | $0 | Not Implemented |