IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0740 # 01 Y:2017 01 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,310 $1,320 Not Implemented
AM0740 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,720 $23,900 Not Implemented
AM0740 # 06 Y:2017 06 2017 USE SYNTHETIC LUBRICANT $1,465 $0 Not Implemented
AM0740 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,430 $10 Not Implemented
AM0740 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,630 $0 Not Implemented
AM0740 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,570 $4,160 Not Implemented
AM0740 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $1,000 Not Implemented
GT0907 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $15,841 $80,789 Not Implemented
GT0907 # 04 Y:2017 04 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $519 $3,858 Not Implemented
GT0907 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $369 $120 Not Implemented
GT0907 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,145 $9,268 Not Implemented
NL0013 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $6,493 $7,000 Not Implemented
NL0013 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,676 $452 Implemented
NL0013 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $133 $110 Not Implemented
NL0013 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $668 $0 Not Implemented
NL0013 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $485 $273 Not Implemented
NL0013 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $6,000 $16,000 Implemented
NL0013 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $309 $111 Not Implemented
MI0318 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,527 $3,864 Not Implemented
MI0318 # 08 Y:2017 08 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,591 $4,940 Implemented
MI0318 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,318 $3,540 Implemented
MI0318 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,034 $9,660 Implemented
MI0318 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,714 $1,660 Implemented
MI0318 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $21,088 $106,884 Not Implemented
MI0318 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,550 $39,636 Implemented