IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

331

matching recommendations
Reset
SIC 2041 Flour And Other Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0499 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,271 $5,600 Implemented
WM0159 # 08 Y:2020 08 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $780 $1,585 Not Implemented
WM0159 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $4,345 $4,350 Not Implemented
WM0159 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,357 $43,670 Implemented
WM0159 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $841 $0 Not Implemented
WM0159 # 03 Y:2020 03 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,640 $45,000 Not Implemented
WM0159 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $589 $1,748 Implemented
WM0159 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,843 $3,560 Not Implemented
WM0159 # 01 Y:2020 01 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $54,997 $46,180 Not Implemented
WM0159 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,043 $11,523 Not Implemented
BS0124 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,766 $6,213 Not Implemented
BS0124 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $392 $1,259 Not Implemented
BS0124 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,609 $1,030 Not Implemented
BS0124 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,460 $2,200 Not Implemented
SU0456 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $194 $125 Implemented
SU0456 # 04 Y:2018 04 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,600 $675 Implemented
SU0456 # 03 Y:2018 03 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $150 $0 Implemented
SU0456 # 05 Y:2018 05 2018 ELIMINATE/REDUCE AN OPERATION $5,417 $1,800 Implemented
SU0456 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $6,863 $15,312 Implemented
SU0456 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $717 $0 Implemented
SU0456 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $884 $2,658 Implemented
SU0456 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,138 $0 Implemented
SU0456 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $27,797 $38,674 Implemented
MI0318 # 08 Y:2017 08 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,591 $4,940 Implemented
MI0318 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,527 $3,864 Not Implemented