IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2041 Flour And Other Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0565 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $500 Not Implemented
CO0565 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $490 $500 Implemented
CO0565 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,160 $4,070 Not Implemented
CO0565 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,830 $270 Implemented
CO0565 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,930 $8,780 Not Implemented
CO0565 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,150 $1,210 Implemented
CO0565 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,830 $26,240 Not Implemented
CO0565 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $130 $210 Not Implemented
CO0073 # 06 Y:1986 06 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,876 $4 Implemented
CO0073 # 10 Y:1986 10 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $382 $50 Implemented
CO0073 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $999 $300 Implemented
CO0073 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,183 $0 Implemented
CO0073 # 07 Y:1986 07 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,505 $600 Not Implemented
CO0072 # 01 Y:1986 01 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,672 $75,000 Implemented
CO0073 # 05 Y:1986 05 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,212 $800 Implemented
CO0073 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,061 $200 Implemented
CO0073 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $15,180 $3,000 Implemented
CO0073 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,376 $21,600 Not Implemented
CO0073 # 01 Y:1986 01 1986 IMPROVE LUBRICATION PRACTICES $30,451 $0 Implemented
CO0072 # 08 Y:1986 08 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,426 $32,254 Not Implemented
CO0072 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $4,157 $5,000 Not Implemented
CO0072 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,883 $500 Implemented
CO0072 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $17,594 $0 Not Implemented
CO0072 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,044 $200 Not Implemented
CO0072 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,255 $20 Implemented