IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2041 Flour And Other Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0417 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,845 $0 Implemented
MI0417 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,705 $18,960 Not Implemented
MI0417 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,521 $4,259 Not Implemented
MI0417 # 05 Y:2022 05 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,078 $12,846 Not Implemented
MI0417 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,907 $580 Not Implemented
MI0417 # 07 Y:2022 07 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,772 $2,740 Not Implemented
MI0417 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,839 $2,140 Implemented
MI0417 # 01 Y:2022 01 2022 UPGRADE CONTROLS ON COMPRESSORS $58,143 $16,338 Not Implemented
UF0248 # 09 Y:2000 09 2000 $98,800 $120,000 Not Implemented
UF0248 # 08 Y:2000 08 2000 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $7,800 $500 Implemented
UF0248 # 07 Y:2000 07 2000 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,786 $909 Implemented
UF0248 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,899 $1,159 Not Implemented
UF0248 # 05 Y:2000 05 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,292 $6,686 Implemented
UF0248 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,859 $600 Implemented
UF0248 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,019 $6,796 Implemented
UF0248 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $3,807 $5,000 Implemented
UF0248 # 01 Y:2000 01 2000 $15,000 $50 Not Implemented
UF0143 # 06 Y:1996 06 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,269 $15,550 Implemented
UF0143 # 05 Y:1996 05 1996 $865,200 $68,400 Not Implemented
UF0143 # 04 Y:1996 04 1996 REDUCE DELIVERY SCHEDULES $1,550 $0 Implemented
UF0143 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,593 $17,828 Implemented
UF0143 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,312 $1,700 Implemented
UF0143 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $750 Implemented