IAC logo
IAC Assessment: UF0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Wheat Flour
NAICS n/a
SIC 2041 - Flour And Other Grain Mill Products
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 28,000
Annual Production 250,000,000 Pounds
Production Hrs. Annual 8,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $333,033 8,745,311 kWh $0.04
Electricity Demand $127,962 15,953 kW-months/year $8.02
TOTAL ENERGY COSTS $460,995
RECOMMENDED SAVINGS* $900,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,556
Cost:
$750
$1,556 29,601 - - - - - - $1,556
29,601
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,312
Cost:
$1,700
$2,312 63,599 - - - - - - $2,312
63,599
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,593
Cost:
$17,828
$9,032 238,570 $3,561 444 - - - - $9,032
238,570
kWh
$3,561
444
kW-months/year
-
-
$
-
-
$
04: 2.8212 REDUCE DELIVERY SCHEDULES Savings:
$1,550
Cost:
-
- - - - $1,550 - - - -
-
kWh
-
-
kW-months/year
$1,550
-
$
-
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$865,200
Cost:
$68,400
- - - - - - $865,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$865,200
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$17,269
Cost:
$15,550
- - $17,269 2,148 - - - - -
-
kWh
$17,269
2,148
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$900,480
Cost:
$104,228
$12,900 331,770 $20,830 2,592 $1,550 - $865,200 - $12,900
331,770
kWh
$20,830
2,592
kW-months/year
$1,550
-
$
$865,200
-
$
TOTAL IMPLEMENTED Savings:
$35,280
Cost:
$35,828
$12,900 331,770 $20,830 2,592 $1,550 - - - $12,900
331,770
kWh
$20,830
2,592
kW-months/year
$1,550
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product