Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2045 | Prepared Flour Mixes And Doughs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0176 # 09 Y:2015 | 09 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,580 | $9,500 | Not Implemented |
MZ0176 # 08 Y:2015 | 08 | 2015 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,330 | $3,500 | Not Implemented |
MZ0176 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $30,675 | $7,500 | Not Implemented |
MZ0176 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,569 | $115,650 | Not Implemented |
MZ0176 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,037 | $1,560 | Not Implemented |
MZ0176 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,923 | $1,000 | Not Implemented |
MZ0176 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,004 | $6,500 | Not Implemented |
MZ0176 # 02 Y:2015 | 02 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $22,758 | $100,000 | Not Implemented |
MZ0176 # 01 Y:2015 | 01 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,279 | $0 | Not Implemented |
MZ0156 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM THICKNESS INSULATION | $9,068 | $30,128 | Implemented |
MZ0156 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,299 | $10,282 | Implemented |
MZ0156 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $31,514 | $141,366 | Implemented |
MZ0156 # 06 Y:2014 | 06 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,337 | $676 | Not Implemented |
MZ0156 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,886 | $4,400 | Implemented |
MZ0156 # 03 Y:2014 | 03 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,460 | $400 | Implemented |
MZ0156 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,480 | $2,000 | Implemented |
MZ0156 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,514 | $71,320 | Implemented |
MZ0141 # 01 Y:2014 | 01 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,625 | $7,000 | Implemented |
MZ0141 # 08 Y:2014 | 08 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,940 | $0 | Implemented |
MZ0141 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $10,446 | $1,875 | Not Implemented |
MZ0141 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,518 | $21,850 | Implemented |
MZ0141 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,440 | $2,500 | Not Implemented |
MZ0141 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,000 | $6,000 | Not Implemented |
MZ0141 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,254 | $11,500 | Not Implemented |
MZ0141 # 02 Y:2014 | 02 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $12,947 | $24,000 | Not Implemented |