Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
297
matching recommendationsSIC | 2047 | Dog And Cat Food |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0633 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,814 | $77,773 | Implemented |
SD0633 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $219,112 | $395,439 | Implemented |
SD0633 # 04 Y:2023 | 04 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $372,017 | $505,200 | Implemented |
SD0633 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,740 | $4,578 | Not Implemented |
SD0633 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,338 | $500 | Implemented |
SD0633 # 08 Y:2023 | 08 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $102,944 | $0 | Implemented |
SD0633 # 01 Y:2023 | 01 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $1,124 | $98 | Implemented |
SD0633 # 07 Y:2023 | 07 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $28,972 | $66,845 | Implemented |
SD0633 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $1,830 | Implemented |
SU0458 # 02 Y:2018 | 02 | 2018 | BURN A LESS EXPENSIVE GRADE OF FUEL | $213,044 | $120,000 | Implemented |
SU0458 # 03 Y:2018 | 03 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $206 | $168 | Not Implemented |
SU0458 # 04 Y:2018 | 04 | 2018 | REPLACE BOILER | $101,732 | $175,000 | Implemented |
SU0458 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $258 | Implemented |
SU0458 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $244 | $0 | Not Implemented |
SU0458 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $189 | $580 | Not Implemented |
SU0458 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $146 | Implemented |
WV0549 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,549 | $0 | Implemented |
WV0549 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $2,345 | $6,890 | Implemented |
WV0549 # 06 Y:2017 | 06 | 2017 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $2,823 | $11,000 | Not Implemented |
WV0549 # 01 Y:2017 | 01 | 2017 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,748 | $105,000 | Not Implemented |
WV0549 # 03 Y:2017 | 03 | 2017 | USE PHOTOCELL CONTROLS | $4,781 | $0 | Implemented |
WV0549 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,263 | $11,180 | Implemented |
WV0549 # 05 Y:2017 | 05 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,241 | $1,000 | Implemented |
WV0549 # 08 Y:2017 | 08 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,180 | $4,272 | Not Implemented |
WV0549 # 09 Y:2017 | 09 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,755 | $0 | Implemented |