IAC logo
IAC Assessment: SD0633
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0633
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Pet and Animal Food
NAICS 311111 - Dog and Cat Food Manufacturing
SIC 2047 - Dog And Cat Food
Sales $50,000,000-$100,000,000
# of Employees 89
Plant Area (Sq.Ft.) 200,000
Annual Production 100,000 Tons
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $265,695 2,806,535 kWh $0.09
Electricity Demand $343,133 7,560 kW-months/year $45.39
Electricity Fees $23,700 - $ -
Natural Gas $348,611 27,575 MMBtu $12.64
TOTAL ENERGY COSTS $981,139
RECOMMENDED SAVINGS* $760,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $759,001
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,124
Cost:
$98
$575 6,069 $549 12 - - - - $575
6,069
kWh
$549
12
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$32,814
Cost:
$77,773
$14,385 151,905 $18,429 406 - - - - $14,385
151,905
kWh
$18,429
406
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$680
Cost:
$1,830
$341 3,600 $327 7 $12 - - - $341
3,600
kWh
$327
7
kW-months/year
$12
-
$
-
-
MMBtu
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$372,017
Cost:
$505,200
$242,905 2,565,000 $326,808 7,200 $(-51,300) - $(-146,396) (-11,582) $242,905
2,565,000
kWh
$326,808
7,200
kW-months/year
$(-51,300)
-
$
$(-146,396)
(-11,582)
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,338
Cost:
$500
$1,338 14,129 - - - - - - $1,338
14,129
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$219,112
Cost:
$395,439
$51,895 547,995 $167,217 3,684 - - - - $51,895
547,995
kWh
$167,217
3,684
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$28,972
Cost:
$66,845
$14,038 148,153 $14,934 329 - - - - $14,038
148,153
kWh
$14,934
329
kW-months/year
-
-
$
-
-
MMBtu
08: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$102,944
Cost:
-
- - $102,944 2,268 - - - - -
-
kWh
$102,944
2,268
kW-months/year
-
-
$
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,740
Cost:
$4,578
$764 8,064 $976 22 - - - - $764
8,064
kWh
$976
22
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$760,741
Cost:
$1,052,263
$326,241 3,444,915 $632,184 13,928 $(-51,288) - $(-146,396) (-11,582) $326,241
3,444,915
kWh
$632,184
13,928
kW-months/year
$(-51,288)
-
$
$(-146,396)
(-11,582)
MMBtu
TOTAL IMPLEMENTED Savings:
$759,001
Cost:
$1,047,685
$325,477 3,436,851 $631,208 13,906 $(-51,288) - $(-146,396) (-11,582) $325,477
3,436,851
kWh
$631,208
13,906
kW-months/year
$(-51,288)
-
$
$(-146,396)
(-11,582)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas