IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 2047 Dog And Cat Food
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0633 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $219,112 $395,439 Implemented
SD0633 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $1,830 Implemented
SD0633 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,814 $77,773 Implemented
SD0633 # 01 Y:2023 01 2023 DEVELOP A REPAIR/REPLACE POLICY $1,124 $98 Implemented
SD0633 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,338 $500 Implemented
SD0633 # 04 Y:2023 04 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $372,017 $505,200 Implemented
SD0633 # 08 Y:2023 08 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $102,944 $0 Implemented
SD0633 # 07 Y:2023 07 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,972 $66,845 Implemented
SU0458 # 02 Y:2018 02 2018 BURN A LESS EXPENSIVE GRADE OF FUEL $213,044 $120,000 Implemented
SU0458 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $258 Implemented
SU0458 # 04 Y:2018 04 2018 REPLACE BOILER $101,732 $175,000 Implemented
SU0458 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $146 Implemented
WV0549 # 15 Y:2017 15 2017 UPGRADE CONTROLS ON COMPRESSORS $527 $2,000 Implemented
WV0549 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $2,345 $6,890 Implemented
WV0549 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,549 $0 Implemented
WV0549 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,680 $500 Implemented
WV0549 # 03 Y:2017 03 2017 USE PHOTOCELL CONTROLS $4,781 $0 Implemented
WV0549 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,263 $11,180 Implemented
WV0549 # 14 Y:2017 14 2017 DEVELOP A REPAIR/REPLACE POLICY $1,016 $582 Implemented
WV0549 # 09 Y:2017 09 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,755 $0 Implemented
WV0549 # 17 Y:2017 17 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $286 $1,075 Implemented
WV0549 # 05 Y:2017 05 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,241 $1,000 Implemented
WV0549 # 16 Y:2017 16 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $308 $20 Implemented
WV0549 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,249 $75 Implemented
BD0481 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $764 $600 Implemented