IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 2047 Dog And Cat Food
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0539 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $976 $200 Implemented
IA0539 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,043 $2,270 Not Implemented
IA0539 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,119 $3,351 Implemented
IA0539 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $11,616 Implemented
IA0539 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,958 $23,028 Implemented
IA0069 # 03 Y:1993 03 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,911 $2,500 Implemented
IA0069 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $0 Implemented
IA0069 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $637 $1,700 Not Implemented
IA0069 # 04 Y:1993 04 1993 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,716 $1,040 Implemented
IA0069 # 02 Y:1993 02 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $62,688 $80,010 Not Implemented
IA0069 # 01 Y:1993 01 1993 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $363,236 $1,064,000 Not Implemented
IA0038 # 01 Y:1992 01 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,039 $9,600 Not Implemented
IA0038 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,925 $1,926 Not Implemented
IA0038 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $693 $1,875 Not Implemented
IA0038 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $848 $25 Not Implemented
IA0038 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,907 $150 Implemented
IA0038 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,673 $2,484 Not Implemented