Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 2047 | Dog And Cat Food |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0549 # 17 Y:2017 | 17 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $286 | $1,075 | Implemented |
WV0549 # 01 Y:2017 | 01 | 2017 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,748 | $105,000 | Not Implemented |
WV0549 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,549 | $0 | Implemented |
WV0549 # 03 Y:2017 | 03 | 2017 | USE PHOTOCELL CONTROLS | $4,781 | $0 | Implemented |
WV0549 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,263 | $11,180 | Implemented |
WV0549 # 05 Y:2017 | 05 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,241 | $1,000 | Implemented |
WV0549 # 06 Y:2017 | 06 | 2017 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $2,823 | $11,000 | Not Implemented |
WV0549 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $2,345 | $6,890 | Implemented |
WV0549 # 08 Y:2017 | 08 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,180 | $4,272 | Not Implemented |
WV0549 # 09 Y:2017 | 09 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,755 | $0 | Implemented |
WV0549 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,680 | $500 | Implemented |
WV0549 # 11 Y:2017 | 11 | 2017 | INSTALL STEAM TRAP | $1,534 | $1,380 | Not Implemented |
WV0549 # 12 Y:2017 | 12 | 2017 | MINIMIZE WATER USAGE | $1,517 | $1,050 | Not Implemented |
WV0549 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,249 | $75 | Implemented |
WV0549 # 14 Y:2017 | 14 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,016 | $582 | Implemented |
WV0549 # 15 Y:2017 | 15 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $527 | $2,000 | Implemented |
WV0549 # 16 Y:2017 | 16 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $308 | $20 | Implemented |
UD0720 # 13 Y:2005 | 13 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $390 | $0 | Implemented |
UD0720 # 15 Y:2005 | 15 | 2005 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $200 | $340 | Implemented |
UD0720 # 14 Y:2005 | 14 | 2005 | USE PHOTOCELL CONTROLS | $296 | $500 | Not Implemented |
UD0720 # 12 Y:2005 | 12 | 2005 | INSULATE BARE EQUIPMENT | $483 | $379 | Not Implemented |
UD0720 # 01 Y:2005 | 01 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $6,931 | $0 | Not Implemented |
UD0720 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,769 | $0 | Implemented |
UD0720 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,870 | $6,000 | Implemented |
UD0720 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,757 | $3,200 | Implemented |