IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2048 Prepared Feeds, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1042 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,761 $14,000 Not Implemented
UD1042 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $301,346 $63,514 Not Implemented
UD1042 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,724 $3,750 Not Implemented
UD1042 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $19,440 $0 Not Implemented
UD1042 # 02 Y:2022 02 2022 REDUCE VENTILATION AIR $10,167 $0 Not Implemented
UD1042 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,096 $3,000 Not Implemented
UD1042 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,033 $0 Not Implemented
UD0780 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,689 $0 Not Implemented
UD0780 # 13 Y:2008 13 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,234 $1,000 Implemented
UD0780 # 12 Y:2008 12 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $2,587 $950 Not Implemented
UD0780 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,749 $1,500 Not Implemented
UD0780 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,382 $12,224 Not Implemented
UD0780 # 09 Y:2008 09 2008 REPAIR AND ELIMINATE STEAM LEAKS $4,058 $700 Not Implemented
UD0780 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,293 $10,770 Not Implemented
UD0780 # 06 Y:2008 06 2008 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,428 $4,000 Implemented
UD0780 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,375 $30,000 Not Implemented
UD0780 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $12,693 $7,000 Implemented
UD0780 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $14,100 $18,000 Not Implemented
UD0780 # 02 Y:2008 02 2008 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $28,671 $23,190 Not Implemented
UD0780 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $31,350 $8,290 Not Implemented
ND0166 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,734 $1,418 Implemented
ND0166 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $200 Not Implemented
ND0166 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $651 $125 Implemented
ND0166 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $803 $459 Not Implemented
ND0166 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,400 $1,500 Implemented