IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2048 Prepared Feeds, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0427 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,234 $7,537 Implemented
KU0427 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $107 Implemented
KU0427 # 05 Y:1994 05 1994 INSTALL TIMERS AND/OR THERMOSTATS $348 $100 Not Implemented
KU0427 # 04 Y:1994 04 1994 TURN OFF STEAM TRACING DURING MILD WEATHER $876 $2,400 Not Implemented
KU0427 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,798 $828 Not Implemented
KU0427 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $1,084 $1,980 Not Implemented
KU0427 # 01 Y:1994 01 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,297 $0 Implemented
KU0154 # 08 Y:1985 08 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,887 $1,200 Implemented
KU0154 # 12 Y:1985 12 1985 REPAIR AND ELIMINATE STEAM LEAKS $108 $50 Implemented
KU0154 # 11 Y:1985 11 1985 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $279 $0 Implemented
KU0154 # 10 Y:1985 10 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $20 Not Implemented
KU0154 # 09 Y:1985 09 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $100 Not Implemented
KU0154 # 07 Y:1985 07 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $974 $0 Implemented
KU0154 # 06 Y:1985 06 1985 INSTALL AUTOMATIC STACK DAMPER $1,854 $700 Not Implemented
KU0154 # 05 Y:1985 05 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,686 $2,700 Not Implemented
KU0154 # 04 Y:1985 04 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,813 $500 Implemented
KU0154 # 03 Y:1985 03 1985 INSTALL SET-BACK TIMERS $4,194 $1,052 Implemented
KU0154 # 02 Y:1985 02 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,380 $3,000 Implemented
KU0154 # 01 Y:1985 01 1985 IMPROVE LUBRICATION PRACTICES $18,860 $0 Not Implemented
KU0100 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,005 $4,164 Not Implemented
KU0100 # 05 Y:1983 05 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $41,200 $41,500 Not Implemented
KU0100 # 04 Y:1983 04 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,967 $10,000 Not Implemented
KU0100 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,770 $2,400 Not Implemented
KU0100 # 02 Y:1983 02 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,578 $10,000 Not Implemented