Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,448
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0581 # 01 Y:2025 | 01 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $990 | $0 | n/a |
SU0581 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,466 | $0 | n/a |
SU0581 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $697 | $38 | n/a |
SU0581 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,579 | $1,648 | n/a |
SU0581 # 07 Y:2025 | 07 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,877 | $1,220 | n/a |
SU0581 # 02 Y:2025 | 02 | 2025 | DISCONNECT BALLASTS | $331 | $0 | n/a |
SU0581 # 09 Y:2025 | 09 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,318 | $15,784 | n/a |
SU0581 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $149 | $172 | n/a |
SU0581 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,336 | $0 | n/a |
SU0581 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $123 | $769 | n/a |
IP0215 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,297 | $5,271 | n/a |
IP0215 # 01 Y:2025 | 01 | 2025 | REDUCE VENTILATION AIR | $14,470 | $0 | n/a |
IP0215 # 10 Y:2025 | 10 | 2025 | OPTIMIZE PLANT POWER FACTOR | $26,556 | $45,576 | n/a |
IP0215 # 05 Y:2025 | 05 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,235 | $276 | n/a |
IP0215 # 09 Y:2025 | 09 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $10,982 | $16,152 | n/a |
IP0215 # 07 Y:2025 | 07 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $58,146 | $9,960 | n/a |
IP0215 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,579 | $790 | n/a |
IP0215 # 11 Y:2025 | 11 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,206 | $2,279 | n/a |
IP0215 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,523 | $960 | n/a |
IP0215 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,861 | $1,390 | n/a |
IP0215 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,770 | $1,390 | n/a |
UD1111 # 02 Y:2025 | 02 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $216 | $0 | n/a |
UD1111 # 01 Y:2025 | 01 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $38,544 | $2,352 | n/a |
UD1111 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,758 | $10,506 | n/a |
UD1111 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $621 | $782 | n/a |