IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0048 # 06 Y:2015 06 2015 AIR CONDITION ONLY SPACE NECESSARY $394 $193 Not Implemented
IP0048 # 05 Y:2015 05 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,880 $430 Implemented
IP0048 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $902 $45 Implemented
IP0048 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,718 $5 Implemented
IP0048 # 02 Y:2015 02 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,379 $5 Implemented
IP0048 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $27,805 $21 Not Implemented
IP0047 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $2,848 $798 Not Implemented
IP0047 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $20,898 Not Implemented
IP0047 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $150 $380 Not Implemented
IP0047 # 09 Y:2015 09 2015 OPTIMIZE PLANT POWER FACTOR $5,199 $23,927 Not Implemented
IP0047 # 06 Y:2015 06 2015 APPLY FOR INVESTMENT INCENTIVES $10,288 $5,000 Implemented
IP0047 # 05 Y:2015 05 2015 APPLY FOR INVESTMENT INCENTIVES $30,801 $10,000 Implemented
IP0047 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,968 $623 Not Implemented
IP0047 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,543 $900 Not Implemented
IP0047 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,458 $163 Implemented
UD0699 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $297,217 $0 Implemented
UD0699 # 02 Y:2004 02 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $85,223 $13,240 Not Implemented
UD0699 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,000 $204,300 Not Implemented
UD0699 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,114 $0 Not Implemented
UD0699 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $8,406 Implemented
UD0699 # 05 Y:2004 05 2004 DISCONNECT BALLASTS $7,031 $377 Implemented
UD0699 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,689 $0 Implemented
UD0699 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276 $890 Not Implemented
UD0699 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $255 Implemented
UD0699 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $775 $0 Implemented