Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
145
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0515 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,453 | $512 | Implemented |
MI0277 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,740 | $7,980 | Implemented |
MI0277 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,327 | $16,640 | Implemented |
MI0277 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,747 | $23,500 | Implemented |
MI0277 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,899 | $4,691 | Implemented |
MI0277 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,958 | $7,530 | Implemented |
MI0277 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,508 | $1,660 | Implemented |
MI0277 # 07 Y:2015 | 07 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,776 | $1,120 | Implemented |
MI0277 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,698 | $639 | Implemented |
MI0277 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,440 | $40 | Implemented |
MI0277 # 10 Y:2015 | 10 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,737 | $3,280 | Implemented |
MI0277 # 11 Y:2015 | 11 | 2015 | USE OPTIMUM THICKNESS INSULATION | $1,507 | $1,610 | Implemented |
MI0277 # 12 Y:2015 | 12 | 2015 | INSTALL OCCUPANCY SENSORS | $1,295 | $290 | Implemented |
MI0277 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $574 | $1,400 | Implemented |
MI0277 # 14 Y:2015 | 14 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $459 | $90 | Implemented |
MI0274 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,151 | $1,660 | Implemented |
MI0274 # 02 Y:2015 | 02 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,336 | $140 | Implemented |
MI0274 # 03 Y:2015 | 03 | 2015 | BURN A LESS EXPENSIVE GRADE OF FUEL | $10,584 | $14,880 | Not Implemented |
MI0274 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,327 | $4,691 | Implemented |
MI0274 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,833 | $11,640 | Implemented |
MI0274 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,565 | $40 | Implemented |
MI0274 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,430 | $1,710 | Implemented |
MI0274 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,100 | $639 | Implemented |
MI0274 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,582 | $6,871 | Implemented |
MI0274 # 10 Y:2015 | 10 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,145 | $780 | Implemented |