IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

298

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0343 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,009 $9,569 Implemented
SF0343 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,112 $220 Implemented
SF0343 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $6,925 $6,063 Implemented
SF0343 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $364 Implemented
SF0342 # 11 Y:2007 11 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $1,536 $5,000 Not Implemented
SF0342 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,677 $54,912 Implemented
SF0342 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,865 $13,500 Not Implemented
SF0342 # 08 Y:2007 08 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $130,413 $250,000 Not Implemented
SF0342 # 07 Y:2007 07 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,176 $22,780 Implemented
SF0342 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $17,040 $25,438 Not Implemented
SF0342 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,282 $34,413 Not Implemented
SF0342 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,412 Not Implemented
SF0342 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,746 $7,500 Implemented
SF0342 # 02 Y:2007 02 2007 AVOID FROST FORMATION ON EVAPORATORS $86,147 $41,628 Not Implemented
SF0342 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $250,944 $80,000 Not Implemented
SD0390 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $9,145 $1,404 Not Implemented
SD0390 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,382 $120 Not Implemented
SD0390 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,427 $5,265 Implemented
SD0390 # 01 Y:2006 01 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $171,093 $182,800 Not Implemented
SD0390 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,435 $42,808 Implemented
SD0390 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $14,632 $13,345 Not Implemented
SD0390 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,469 $6,600 Implemented
SD0390 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $3,452 $168 Implemented
SD0388 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,284 $80,876 Implemented
SD0388 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,328 $36,752 Implemented