IAC Assessment: SD0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2006
Principal Product bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 110,000
Annual Production 24,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,635 5,051,240 kWh $0.06
Electricity Demand $163,336 8,037 kW-months/year $20.32
Natural Gas $708,553 69,652 MMBtu $10.17
TOTAL ENERGY COSTS $1,197,524
RECOMMENDED SAVINGS* $228,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,783
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$171,093
Cost:
$182,800
$183,933 2,851,680 $111,435 5,484 $(-99,024) (-9,734) $(-25,251) - $183,933
2,851,680
kWh
$111,435
5,484
kW-months/year
$(-99,024)
(-9,734)
MMBtu
$(-25,251)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,435
Cost:
$42,808
$14,263 221,126 $6,172 304 - - - - $14,263
221,126
kWh
$6,172
304
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,632
Cost:
$13,345
- - - - $14,632 1,438 - - -
-
kWh
-
-
kW-months/year
$14,632
1,438
MMBtu
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$9,145
Cost:
$1,404
$3,354 52,014 $5,791 285 - - - - $3,354
52,014
kWh
$5,791
285
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,469
Cost:
$6,600
$2,250 87,176 $1,219 140 - - - - $2,250
87,176
kWh
$1,219
140
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,452
Cost:
$168
$3,452 53,533 - - - - - - $3,452
53,533
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,382
Cost:
$120
$2,366 36,691 $1,016 50 - - - - $2,366
36,691
kWh
$1,016
50
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,427
Cost:
$5,265
$1,696 26,295 $731 36 - - - - $1,696
26,295
kWh
$731
36
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$228,035
Cost:
$252,510
$211,314 3,328,515 $126,364 6,299 $(-84,392) (-8,296) $(-25,251) - $211,314
3,328,515
kWh
$126,364
6,299
kW-months/year
$(-84,392)
(-8,296)
MMBtu
$(-25,251)
-
$
TOTAL IMPLEMENTED Savings:
$29,783
Cost:
$54,841
$21,661 388,130 $8,122 480 - - - - $21,661
388,130
kWh
$8,122
480
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes