IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0487 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $775 $850 Implemented
GT0487 # 06 Y:1993 06 1993 REPLACE BOILER $6,960 $16,500 Not Implemented
GT0487 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,982 $7,000 Implemented
GT0487 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,940 $0 Implemented
GT0487 # 09 Y:1993 09 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $7,530 $1,000 Implemented
GT0487 # 10 Y:1993 10 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $790 $0 Implemented
HO0036 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,312 $1,247 Not Implemented
HO0036 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $759 $338 Not Implemented
HO0036 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $708 $1,000 Not Implemented
KU0377 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,946 $3,885 Implemented
KU0377 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,936 $700 Not Implemented
KU0377 # 03 Y:1992 03 1992 INSTALL TURBULATORS $1,406 $2,122 Implemented
KU0377 # 04 Y:1992 04 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $645 $1,847 Not Implemented
KU0377 # 05 Y:1992 05 1992 INSTALL STORM WINDOWS AND DOORS $476 $154 Implemented
KU0377 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,731 $1,200 Implemented
KU0377 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $590 $450 Implemented
KU0377 # 08 Y:1992 08 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $617 $1,600 Not Implemented
GT0464 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $10,600 Not Implemented
GT0464 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $6,000 Not Implemented
GT0464 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $247 $375 Not Implemented
GT0464 # 04 Y:1992 04 1992 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $256 $300 Not Implemented
GT0464 # 05 Y:1992 05 1992 REPLACE BOILER $8,120 $18,000 Not Implemented
GT0464 # 06 Y:1992 06 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,680 $23,500 Not Implemented
WI0147 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,588 $0 Not Implemented
WI0147 # 02 Y:1992 02 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,926 $30,000 Not Implemented