Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
298
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0612 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,468 | $41,738 | n/a |
SF0612 # 06 Y:2024 | 06 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $21,923 | $54,880 | n/a |
SF0612 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $106 | $151 | n/a |
SF0612 # 02 Y:2024 | 02 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $175 | $59 | n/a |
SF0612 # 04 Y:2024 | 04 | 2024 | ISOLATE HOT OR COLD EQUIPMENT | $3,665 | $4,130 | n/a |
SF0612 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $73,026 | $18,461 | n/a |
SF0612 # 01 Y:2024 | 01 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,332 | $226 | n/a |
SF0600 # 04 Y:2023 | 04 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $17,278 | $24,708 | Not Implemented |
SF0600 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $937 | $3,563 | Not Implemented |
SF0600 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $738 | $50 | Implemented |
SF0600 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,662 | $6,270 | Not Implemented |
SF0600 # 01 Y:2023 | 01 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,276 | $0 | Not Implemented |
SF0600 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,839 | $316,988 | Implemented |
SF0595 # 04 Y:2023 | 04 | 2023 | HEAT WATER WITH EXHAUST HEAT | $37,173 | $32,818 | Not Implemented |
SF0595 # 02 Y:2023 | 02 | 2023 | USE OPTIMUM THICKNESS INSULATION | $2,174 | $1,800 | Implemented |
SF0595 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,280 | $7,191 | Implemented |
SF0595 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,469 | $5,620 | Implemented |
SF0595 # 03 Y:2023 | 03 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,134 | $7,644 | Not Implemented |
SF0595 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,989 | $21,654 | Implemented |
SF0595 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,809 | $1,487 | Implemented |
SF0546 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,458 | $28,920 | Not Implemented |
SF0546 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,375 | $542 | Implemented |
SF0546 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,228 | $705 | Not Implemented |
SF0546 # 04 Y:2019 | 04 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,331 | $84,932 | Not Implemented |
SD0569 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,832 | $13,363 | Implemented |