IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0988 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $7,394 $12,000 Not Implemented
OK0988 # 04 Y:2018 04 2018 USE SOLAR HEAT TO HEAT WATER $4,920 $155,149 Not Implemented
OK0988 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,279 $15,642 Not Implemented
OK0988 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $2,330 Not Implemented
OK0912 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $710 $806 Not Implemented
OK0912 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,007 $1,150 Implemented
OK0912 # 08 Y:2015 08 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $64 $46 Implemented
OK0912 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,191 $8,250 Implemented
OK0912 # 05 Y:2015 05 2015 USE RADIANT HEATER FOR SPOT HEATING $34,469 $69,120 Not Implemented
OK0912 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $18,908 $74,880 Not Implemented
OK0912 # 06 Y:2015 06 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,077 $10,897 Implemented
OK0912 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $699 $1,752 Implemented
OK0912 # 10 Y:2015 10 2015 RECOVER WASTE HEAT FROM EQUIPMENT $10,628 $60,000 Not Implemented
OK0912 # 07 Y:2015 07 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $421 $1,460 Not Implemented
OK0912 # 09 Y:2015 09 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,274 $460 Implemented
OK0912 # 12 Y:2015 12 2015 OPTIMIZE PLANT POWER FACTOR $7,346 $12,507 Not Implemented
OK0912 # 11 Y:2015 11 2015 INSULATE BARE EQUIPMENT $341 $208 Not Implemented
OK0791 # 02 Y:2010 02 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,321 $7,025 Not Implemented
OK0791 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $3,735 Implemented
OK0791 # 07 Y:2010 07 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,122 $8,027 Not Implemented
OK0791 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,687 $915 Not Implemented
OK0791 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,782 $61,666 Not Implemented
OK0791 # 13 Y:2010 13 2010 INSTALL SET-BACK TIMERS $684 $1,024 Not Implemented
OK0791 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,392 $12,540 Not Implemented
OK0791 # 12 Y:2010 12 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $655 $0 Not Implemented