IAC logo
IAC Assessment: OK0791
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0791
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2010
Principal Product Frozen Dough
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 100,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 4,320
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,101,382 15,934,800 kWh $0.07
Electricity Demand $145,264 29,467 kW-months/year $4.93
Natural Gas $160,600 22,515 MMBtu $7.13
TOTAL ENERGY COSTS $1,480,052
RECOMMENDED SAVINGS* $108,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,919
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$65,369
Cost:
$268,762
- - - - $65,369 8,564 -
-
kWh
-
-
kW-months/year
$65,369
8,564
MMBtu
02: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$3,321
Cost:
$7,025
$3,321 48,064 - - - - $3,321
48,064
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,782
Cost:
$61,666
$21,782 315,220 - - - - $21,782
315,220
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$900
Cost:
$3,735
$900 13,022 - - - - $900
13,022
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,255
Cost:
$3,402
$1,255 18,168 - - - - $1,255
18,168
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,392
Cost:
$12,540
$4,392 63,569 - - - - $4,392
63,569
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,122
Cost:
$8,027
- - - - $3,122 438 -
-
kWh
-
-
kW-months/year
$3,122
438
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,026
Cost:
$11,800
- - - - $1,026 128 -
-
kWh
-
-
kW-months/year
$1,026
128
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,130
Cost:
$1,244
- - - - $2,130 298 -
-
kWh
-
-
kW-months/year
$2,130
298
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,687
Cost:
$915
$1,687 24,428 - - - - $1,687
24,428
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,764
Cost:
$1,050
$1,764 25,541 - - - - $1,764
25,541
kWh
-
-
kW-months/year
-
-
MMBtu
12: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$655
Cost:
-
- - $655 12 - - -
-
kWh
$655
12
kW-months/year
-
-
MMBtu
13: 2.6232 INSTALL SET-BACK TIMERS Savings:
$684
Cost:
$1,024
- - - - $684 96 -
-
kWh
-
-
kW-months/year
$684
96
MMBtu
TOTAL RECOMMENDED Savings:
$108,087
Cost:
$381,190
$35,101 508,012 $655 12 $72,331 9,524 $35,101
508,012
kWh
$655
12
kW-months/year
$72,331
9,524
MMBtu
TOTAL IMPLEMENTED Savings:
$3,919
Cost:
$8,187
$3,919 56,731 - - - - $3,919
56,731
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas