Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0366 # 05 Y:2007 | 05 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,430 | $12,000 | Implemented |
NC0366 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,491 | $250,000 | Not Implemented |
NC0366 # 03 Y:2007 | 03 | 2007 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $18,013 | $60,000 | Not Implemented |
NC0366 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $81,321 | $400,000 | Not Implemented |
NC0366 # 04 Y:2007 | 04 | 2007 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $71,297 | $280,000 | Implemented |
MI0153 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,348 | $1,074 | Not Implemented |
MI0153 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,866 | $54,000 | Not Implemented |
MI0153 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $342,569 | $290,000 | Not Implemented |
MI0153 # 03 Y:2007 | 03 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,256 | $260 | Not Implemented |
MI0153 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $628 | $2,610 | Not Implemented |
SF0343 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,112 | $220 | Implemented |
SF0343 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,925 | $6,063 | Implemented |
SF0343 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $385 | $364 | Implemented |
SF0343 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,009 | $9,569 | Implemented |
SF0342 # 04 Y:2007 | 04 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,598 | $1,412 | Not Implemented |
SF0342 # 02 Y:2007 | 02 | 2007 | AVOID FROST FORMATION ON EVAPORATORS | $86,147 | $41,628 | Not Implemented |
SF0342 # 03 Y:2007 | 03 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,746 | $7,500 | Implemented |
SF0342 # 06 Y:2007 | 06 | 2007 | INSTALL OCCUPANCY SENSORS | $17,040 | $25,438 | Not Implemented |
SF0342 # 01 Y:2007 | 01 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $250,944 | $80,000 | Not Implemented |
SF0342 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,865 | $13,500 | Not Implemented |
SF0342 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,282 | $34,413 | Not Implemented |
SF0342 # 11 Y:2007 | 11 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,536 | $5,000 | Not Implemented |
SF0342 # 07 Y:2007 | 07 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,176 | $22,780 | Implemented |
SF0342 # 08 Y:2007 | 08 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $130,413 | $250,000 | Not Implemented |
SF0342 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,677 | $54,912 | Implemented |