IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

880

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0065 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,628 $300 Implemented
CO0065 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $1,200 Implemented
CO0065 # 08 Y:1986 08 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,715 $3,750 Implemented
CO0065 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $697 $300 Implemented
CO0065 # 11 Y:1986 11 1986 INSTALL TIMERS AND/OR THERMOSTATS $521 $85 Implemented
CO0065 # 12 Y:1986 12 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,951 $1,328 Implemented
TN0276 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $4,831 $95 Implemented
TN0276 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,382 $0 Implemented
TN0276 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $566 $1,851 Implemented
TN0276 # 06 Y:1986 06 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $373 $500 Implemented
TN0276 # 07 Y:1986 07 1986 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $122 $600 Implemented
TN0276 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $45 Implemented
UD0195 # 01 Y:1986 01 1986 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $10,751 $0 Implemented
UD0195 # 02 Y:1986 02 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $418 $0 Implemented
AT0035 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $318 Implemented
AT0035 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $326 $0 Implemented
AT0035 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $1,674 $200 Implemented
UD0162 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,788 $40 Implemented
LT0015 # 01 Y:1984 01 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $138 $84 Implemented
LT0015 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $980 $2,704 Implemented
KU0129 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,368 $3,000 Implemented
KU0129 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,366 $0 Implemented
KU0129 # 05 Y:1984 05 1984 INSTALL TURBULATORS $7,337 $2,000 Implemented
KU0129 # 06 Y:1984 06 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,922 $3,000 Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented