IAC Assessment: KU0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product BREADS & BAKED GOODS
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 345
Plant Area (Sq.Ft.) 0
Annual Production 39,000,000 Pounds
Production Hrs. Annual 8,712
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,148 2,869,871 kWh $0.06
Natural Gas $242,181 57,612 MMBtu $4.20
TOTAL ENERGY COSTS $415,329
RECOMMENDED SAVINGS* $73,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,730
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$15,682
Cost:
$1,300
$15,682 259,965 - - $15,682
259,965
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,014
Cost:
$6,400
$(-159) (-2,638) $8,173 1,946 $(-159)
(-2,638)
kWh
$8,173
1,946
MMBtu
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,368
Cost:
$3,000
- - $3,368 802 -
-
kWh
$3,368
802
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,366
Cost:
-
- - $10,366 2,468 -
-
kWh
$10,366
2,468
MMBtu
05: 2.1222 INSTALL TURBULATORS Savings:
$7,337
Cost:
$2,000
- - $7,337 1,747 -
-
kWh
$7,337
1,747
MMBtu
06: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$4,922
Cost:
$3,000
- - $4,922 1,172 -
-
kWh
$4,922
1,172
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,524
Cost:
$8,000
- - $3,524 839 -
-
kWh
$3,524
839
MMBtu
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,411
Cost:
$1,330
- - $1,411 336 -
-
kWh
$1,411
336
MMBtu
09: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$2,264
Cost:
$2,500
- - $2,264 539 -
-
kWh
$2,264
539
MMBtu
10: 2.2114 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE Savings:
$5,557
Cost:
$300
- - $5,557 1,323 -
-
kWh
$5,557
1,323
MMBtu
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,428
Cost:
$3,565
$5,428 89,977 - - $5,428
89,977
kWh
-
-
MMBtu
13: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,710
Cost:
$960
$2,710 - - - $2,710
-
kWh
-
-
MMBtu
14: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,390
Cost:
$4,520
- - $2,390 569 -
-
kWh
$2,390
569
MMBtu
15: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$495
Cost:
$500
$495 8,206 - - $495
8,206
kWh
-
-
MMBtu
16: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$283
Cost:
$120
$283 4,689 - - $283
4,689
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$73,751
Cost:
$37,495
$24,439 360,199 $49,312 11,741 $24,439
360,199
kWh
$49,312
11,741
MMBtu
TOTAL IMPLEMENTED Savings:
$42,730
Cost:
$15,945
$8,916 102,872 $33,814 8,051 $8,916
102,872
kWh
$33,814
8,051
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas