Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 2051 | Bread, Cake, And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0912 # 08 Y:2015 | 08 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $64 | $46 | Implemented |
OK0912 # 13 Y:2015 | 13 | 2015 | INSULATE BARE EQUIPMENT | $18,908 | $74,880 | Not Implemented |
OK0912 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $710 | $806 | Not Implemented |
OK0912 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,007 | $1,150 | Implemented |
OK0912 # 06 Y:2015 | 06 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,077 | $10,897 | Implemented |
OK0912 # 10 Y:2015 | 10 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,628 | $60,000 | Not Implemented |
OK0912 # 11 Y:2015 | 11 | 2015 | INSULATE BARE EQUIPMENT | $341 | $208 | Not Implemented |
OK0912 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,191 | $8,250 | Implemented |
OK0912 # 05 Y:2015 | 05 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $34,469 | $69,120 | Not Implemented |
OK0912 # 12 Y:2015 | 12 | 2015 | OPTIMIZE PLANT POWER FACTOR | $7,346 | $12,507 | Not Implemented |
OK0912 # 09 Y:2015 | 09 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,274 | $460 | Implemented |
OK0912 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $699 | $1,752 | Implemented |
OK0912 # 07 Y:2015 | 07 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $421 | $1,460 | Not Implemented |
OK0791 # 11 Y:2010 | 11 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,764 | $1,050 | Implemented |
OK0791 # 08 Y:2010 | 08 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,026 | $11,800 | Not Implemented |
OK0791 # 07 Y:2010 | 07 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,122 | $8,027 | Not Implemented |
OK0791 # 10 Y:2010 | 10 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,687 | $915 | Not Implemented |
OK0791 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,782 | $61,666 | Not Implemented |
OK0791 # 13 Y:2010 | 13 | 2010 | INSTALL SET-BACK TIMERS | $684 | $1,024 | Not Implemented |
OK0791 # 09 Y:2010 | 09 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,130 | $1,244 | Not Implemented |
OK0791 # 12 Y:2010 | 12 | 2010 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $655 | $0 | Not Implemented |
OK0791 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,255 | $3,402 | Implemented |
OK0791 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $65,369 | $268,762 | Not Implemented |
OK0791 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $900 | $3,735 | Implemented |
OK0791 # 06 Y:2010 | 06 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,392 | $12,540 | Not Implemented |