Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 2051 | Bread, Cake, And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0142 # 02 Y:2002 | 02 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,986 | $0 | Not Implemented |
LL0142 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $554 | $289 | Implemented |
LL0142 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $406 | $45 | Not Implemented |
LL0142 # 05 Y:2002 | 05 | 2002 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $14,301 | $0 | Not Implemented |
LL0142 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,508 | $3,000 | Implemented |
SD0295 # 09 Y:2002 | 09 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $5,965 | $3,500 | Not Implemented |
SD0295 # 08 Y:2002 | 08 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $416,352 | $655,000 | Implemented |
SD0295 # 07 Y:2002 | 07 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $198,000 | $15,000 | Not Implemented |
SD0295 # 06 Y:2002 | 06 | 2002 | INSTALL SKYLIGHTS | $543 | $1,200 | Not Implemented |
SD0295 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,373 | $3,000 | Not Implemented |
SD0295 # 04 Y:2002 | 04 | 2002 | USE PHOTOCELL CONTROLS | $1,578 | $1,000 | Implemented |
SD0295 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,967 | $0 | Not Implemented |
SD0295 # 02 Y:2002 | 02 | 2002 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,840 | $0 | Not Implemented |
SD0295 # 01 Y:2002 | 01 | 2002 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $9,645 | $200 | Not Implemented |
MI0029 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,668 | $3 | Implemented |
MI0029 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,657 | $2,122 | Implemented |
MI0029 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,287 | $1,550 | Implemented |
MI0029 # 02 Y:2002 | 02 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,380 | $42,432 | Not Implemented |
MI0029 # 01 Y:2002 | 01 | 2002 | METER WASTE WATER | $73,069 | $3,650 | Not Implemented |