IAC logo
IAC Assessment: SD0295
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0295
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product pizza
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales n/a
# of Employees 300
Plant Area (Sq.Ft.) 70,000
Annual Production 171,360,000 Pounds
Production Hrs. Annual 8,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $725,011 7,133,045 kWh $0.10
Electricity Demand $187,466 13,766 kW-months/year $13.62
Electricity Fees $3,588 - $ -
Natural Gas $359,466 59,240 MMBtu $6.07
TOTAL ENERGY COSTS $1,292,617
RECOMMENDED SAVINGS* $664,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $417,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$9,645
Cost:
$200
$9,645 94,955 - - - - - - $9,645
94,955
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,840
Cost:
-
- - $3,840 282 - - - - -
-
kWh
$3,840
282
kW-months/year
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$26,967
Cost:
-
$26,462 26,462 $505 37 - - - - $26,462
26,462
kWh
$505
37
kW-months/year
-
-
lb
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,578
Cost:
$1,000
$901 8,868 $677 50 - - - - $901
8,868
kWh
$677
50
kW-months/year
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,373
Cost:
$3,000
$1,181 11,625 $192 14 - - - - $1,181
11,625
kWh
$192
14
kW-months/year
-
-
lb
-
-
$
06: 2.7145 INSTALL SKYLIGHTS Savings:
$543
Cost:
$1,200
$310 3,052 $233 17 - - - - $310
3,052
kWh
$233
17
kW-months/year
-
-
lb
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$198,000
Cost:
$15,000
- - - - $198,000 - - - -
-
kWh
-
-
kW-months/year
$198,000
-
lb
-
-
$
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$416,352
Cost:
$655,000
- - - - - - $416,352 - -
-
kWh
-
-
kW-months/year
-
-
lb
$416,352
-
$
09: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$5,965
Cost:
$3,500
- - - - - - $5,965 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,965
-
$
TOTAL RECOMMENDED Savings:
$664,263
Cost:
$678,900
$38,499 144,962 $5,447 400 $198,000 - $422,317 - $38,499
144,962
kWh
$5,447
400
kW-months/year
$198,000
-
lb
$422,317
-
$
TOTAL IMPLEMENTED Savings:
$417,930
Cost:
$656,000
$901 8,868 $677 50 - - $416,352 - $901
8,868
kWh
$677
50
kW-months/year
-
-
lb
$416,352
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $