IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0183 # 08 Y:2009 08 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $133 $60 Implemented
MI0183 # 07 Y:2009 07 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $198 $180 Not Implemented
MI0183 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,750 $1,500 Implemented
MI0183 # 01 Y:2009 01 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,088 $1,360 Implemented
MI0183 # 02 Y:2009 02 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,816 $1,280 Not Implemented
MI0183 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,012 $1,200 Not Implemented
MI0183 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,501 $2,320 Not Implemented
MI0183 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,481 $320 Implemented
MA0654 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,750 $30,000 Implemented
MA0654 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,876 $9,840 Not Implemented
MA0654 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,377 $18,330 Implemented
MA0654 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $22,566 $39,500 Not Implemented
OR0546 # 01 Y:2009 01 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $350 Not Implemented
OR0546 # 02 Y:2009 02 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $24,190 $17,000 Not Implemented
OR0546 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $7,200 $10,500 Not Implemented
OR0546 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $4,087 $7,170 Not Implemented
OR0546 # 05 Y:2009 05 2009 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,220 $6,680 Not Implemented
OR0546 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,466 $37,682 Not Implemented
OR0546 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,406 $1,600 Not Implemented
OR0546 # 08 Y:2009 08 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,132 $13,620 Not Implemented
OR0546 # 09 Y:2009 09 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,251 $1,456 Not Implemented