IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 2053 Frozen Bakery Products, Except Bread
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0360 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,717 $10,269 Implemented
SF0360 # 02 Y:2008 02 2008 COMBINE UTILITY METERS $1,439 $1,210 Not Implemented
SF0360 # 01 Y:2008 01 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $103 $0 Implemented
SF0342 # 11 Y:2007 11 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $1,536 $5,000 Not Implemented
SF0342 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,677 $54,912 Implemented
SF0342 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,865 $13,500 Not Implemented
SF0342 # 08 Y:2007 08 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $130,413 $250,000 Not Implemented
SF0342 # 07 Y:2007 07 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,176 $22,780 Implemented
SF0342 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $17,040 $25,438 Not Implemented
SF0342 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $250,944 $80,000 Not Implemented
SF0342 # 02 Y:2007 02 2007 AVOID FROST FORMATION ON EVAPORATORS $86,147 $41,628 Not Implemented
SF0342 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,746 $7,500 Implemented
SF0342 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,412 Not Implemented
SF0342 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,282 $34,413 Not Implemented
SD0385 # 03 Y:2006 03 2006 INSTALL SKYLIGHTS $4,712 $6,400 Not Implemented
SD0385 # 05 Y:2006 05 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,989 $19,500 Not Implemented
SD0385 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $17,804 Not Implemented
SD0385 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,090 $17,767 Implemented
SD0385 # 01 Y:2006 01 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $273,018 $135,000 Not Implemented
LM0033 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,578 $0 Not Implemented
LM0033 # 09 Y:2002 09 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $90,240 $34,800 Not Implemented
LM0033 # 07 Y:2002 07 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $243,003 $208,000 Not Implemented
LM0033 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $237,812 $70,000 Not Implemented
LM0033 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $6,143 $10,400 Not Implemented
LM0033 # 10 Y:2002 10 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $231,120 $395,000 Not Implemented