IAC Assessment: LM0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product frozen pies
NAICS n/a
SIC 2053 - Frozen Bakery Products, Except Bread
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 76,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 5,280
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $360,621 3,395,880 kWh $0.11
Electricity Demand $54,165 6,504 kW-months/year $8.33
Electricity Fees $35,873 - $ -
Natural Gas $67,500 10,387 MMBtu $6.50
TOTAL ENERGY COSTS $518,159
RECOMMENDED SAVINGS* $923,279 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$6,143
Cost:
$10,400
$5,775 40,357 $368 97 - - - - - - $5,775
40,357
kWh
$368
97
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,578
Cost:
-
$1,441 10,070 $137 38 - - - - - - $1,441
10,070
kWh
$137
38
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,854
Cost:
$370
$2,700 18,866 $154 43 - - - - - - $2,700
18,866
kWh
$154
43
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$23,073
Cost:
$31,000
$16,297 113,900 $6,776 1,898 - - - - - - $16,297
113,900
kWh
$6,776
1,898
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$64,833
Cost:
$96,800
$62,690 438,100 $2,143 600 - - - - - - $62,690
438,100
kWh
$2,143
600
kW-months/year
-
-
$
-
-
$
-
-
$
06: 4.422 UTILIZE OUTSIDE CONTRACTING Savings:
$22,623
Cost:
$12,000
$149,919 1,047,725 $5,124 4,112 $190,080 - $(-322,500) - - - $149,919
1,047,725
kWh
$5,124
4,112
kW-months/year
$190,080
-
$
$(-322,500)
-
$
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$243,003
Cost:
$208,000
- - - - $63,360 - $155,643 - $24,000 - -
-
kWh
-
-
kW-months/year
$63,360
-
$
$155,643
-
$
$24,000
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$237,812
Cost:
$70,000
- - - - $237,812 - - - - - -
-
kWh
-
-
kW-months/year
$237,812
-
$
-
-
$
-
-
$
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$90,240
Cost:
$34,800
- - - - - - - - $90,240 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$90,240
-
$
10: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$231,120
Cost:
$395,000
- - - - $231,120 - - - - - -
-
kWh
-
-
kW-months/year
$231,120
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$923,279
Cost:
$858,370
$238,822 1,669,018 $14,702 6,788 $722,372 - $(-166,857) - $114,240 - $238,822
1,669,018
kWh
$14,702
6,788
kW-months/year
$722,372
-
$
$(-166,857)
-
$
$114,240
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product