Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
449
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0077 # 03 Y:1986 | 03 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $66 | $0 | Implemented |
ST0077 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $944 | $900 | Implemented |
ST0077 # 05 Y:1986 | 05 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $122 | $30 | Implemented |
ST0077 # 06 Y:1986 | 06 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $27,027 | $30,000 | Implemented |
ST0077 # 08 Y:1986 | 08 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $169 | $150 | Implemented |
ST0077 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $735 | $278 | Implemented |
TN0277 # 01 Y:1986 | 01 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,434 | $15,840 | Implemented |
TN0277 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,442 | $150 | Implemented |
TN0277 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,251 | $500 | Implemented |
TN0277 # 04 Y:1986 | 04 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $2,016 | $125 | Implemented |
TN0277 # 07 Y:1986 | 07 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $826 | $1,700 | Implemented |
TN0277 # 08 Y:1986 | 08 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $0 | Implemented |
TN0277 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $661 | $440 | Implemented |
TN0277 # 10 Y:1986 | 10 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $149 | $220 | Implemented |
ST0067 # 01 Y:1986 | 01 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,304 | $0 | Implemented |
ST0067 # 03 Y:1986 | 03 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,202 | $30,000 | Implemented |
ST0067 # 05 Y:1986 | 05 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,288 | $537 | Implemented |
ST0067 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,828 | $0 | Implemented |
ST0067 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $767 | $228 | Implemented |
ST0067 # 08 Y:1986 | 08 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $882 | $10,000 | Implemented |
TN0267 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,967 | $0 | Implemented |
TN0267 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $5,424 | $2,400 | Implemented |
TN0267 # 03 Y:1985 | 03 | 1985 | REPAIR AND ELIMINATE STEAM LEAKS | $4,358 | $87 | Implemented |
TN0267 # 04 Y:1985 | 04 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,910 | $614 | Implemented |