IAC logo
IAC Assessment: TN0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1986
Principal Product HARD/JELLY CANDY, CHOCOL
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $5,000,000-$10,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 7,000,000 Pounds
Production Hrs. Annual 3,500
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,503 1,517,878 kWh $0.06
Natural Gas $84,433 17,577 MMBtu $4.80
TOTAL ENERGY COSTS $169,936
RECOMMENDED SAVINGS* $16,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,175
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,434
Cost:
$15,840
- - $5,434 1,132 -
-
kWh
$5,434
1,132
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,442
Cost:
$150
- - $3,442 717 -
-
kWh
$3,442
717
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,251
Cost:
$500
- - $2,251 469 -
-
kWh
$2,251
469
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,016
Cost:
$125
- - $2,016 420 -
-
kWh
$2,016
420
MMBtu
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$581
Cost:
$2,500
- - $581 121 -
-
kWh
$581
121
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$264
Cost:
$111
- - $264 55 -
-
kWh
$264
55
MMBtu
07: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$826
Cost:
$1,700
$826 14,654 - - $826
14,654
kWh
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$396
Cost:
-
$396 7,034 - - $396
7,034
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$661
Cost:
$440
$661 11,723 - - $661
11,723
kWh
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$149
Cost:
$220
$149 2,638 - - $149
2,638
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,020
Cost:
$21,586
$2,032 36,049 $13,988 2,914 $2,032
36,049
kWh
$13,988
2,914
MMBtu
TOTAL IMPLEMENTED Savings:
$15,175
Cost:
$18,975
$2,032 36,049 $13,143 2,738 $2,032
36,049
kWh
$13,143
2,738
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas