IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,009

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0542 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,762 $0 Implemented
SF0542 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,796 $1,080 Implemented
SF0542 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,079 $180 Not Implemented
SF0542 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,409 $1,384 Implemented
SF0542 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $143 $111 Not Implemented
SF0542 # 06 Y:2019 06 2019 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $3,054 $9,087 Implemented
SF0542 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,214 $49,905 Implemented
SF0541 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,964 $5,000 Implemented
SF0541 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,815 $1,514 Implemented
SF0541 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,931 $15,969 Implemented
SF0541 # 04 Y:2019 04 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $1,697 $1,327 Implemented
SF0541 # 05 Y:2019 05 2019 REPAIR AND ELIMINATE STEAM LEAKS $7,042 $7,678 Implemented
SF0541 # 06 Y:2019 06 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $261 $578 Implemented
SF0541 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,599 $153,278 Implemented
SF0541 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $2,727 $8,304 Implemented
SF0541 # 09 Y:2019 09 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $36,428 $115,019 Implemented
SF0541 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,140 $26,538 Implemented
SF0541 # 11 Y:2019 11 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $49,416 $245,226 Not Implemented
SF0538 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $146,044 $0 Not Implemented
SF0538 # 02 Y:2019 02 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,680 $12,500 Implemented
SF0538 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,353 $5,947 Implemented
SF0538 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $27,526 $16,915 Not Implemented
SF0538 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,440 $7,616 Implemented
SF0538 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,101 $5,998 Implemented
SF0538 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,533 $34,367 Implemented