Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0783 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,399 | $0 | Implemented |
OK0783 # 08 Y:2009 | 08 | 2009 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $50,901 | $15,708 | Implemented |
OK0783 # 07 Y:2009 | 07 | 2009 | ADJUST BURNERS FOR EFFICIENT OPERATION | $18,978 | $3,810 | Implemented |
OK0783 # 06 Y:2009 | 06 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,392 | $67,320 | Not Implemented |
OK0783 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,219 | $15,039 | Not Implemented |
OK0783 # 04 Y:2009 | 04 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,327 | $26,066 | Not Implemented |
OK0783 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,151 | $775 | Implemented |
OK0783 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112 | $887 | Implemented |
OK0783 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $29,321 | $280,000 | Not Implemented |
LE0284 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,937 | $10,491 | Not Implemented |
LE0284 # 13 Y:2009 | 13 | 2009 | INSTALL OCCUPANCY SENSORS | $685 | $675 | Not Implemented |
LE0284 # 01 Y:2009 | 01 | 2009 | UPGRADE OBSOLETE EQUIPMENT | $42,827 | $30,000 | Not Implemented |
LE0284 # 11 Y:2009 | 11 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $771 | $800 | Not Implemented |
LE0284 # 10 Y:2009 | 10 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $224 | Implemented |
LE0284 # 09 Y:2009 | 09 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $2,855 | $2,000 | Implemented |
LE0284 # 08 Y:2009 | 08 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,911 | $320 | Implemented |
LE0284 # 07 Y:2009 | 07 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,560 | $7,000 | Not Implemented |
LE0284 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,526 | $8,000 | Not Implemented |
LE0284 # 05 Y:2009 | 05 | 2009 | USE SOLAR HEAT TO HEAT WATER | $7,038 | $28,000 | Not Implemented |
LE0284 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,628 | $1,760 | Implemented |
LE0284 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,124 | $8,000 | Not Implemented |
LE0284 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,473 | $20,000 | Not Implemented |