IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 2061 Raw Cane Sugar
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2002 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,691 $12,000 Not Implemented
LS2002 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $540 Implemented
LS2002 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,610 $6,797 Not Implemented
LS2002 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $25 Not Implemented
LL0184 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $37,488 $4,840 Implemented
LL0184 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $315 $90 Not Implemented
LL0184 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $492 $565 Not Implemented
LL0184 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $715 $45 Implemented
LL0184 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,776 $3,200 Implemented
LL0184 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $124,711 $98,000 Not Implemented
LL0184 # 07 Y:2004 07 2004 $1,500 $60 Implemented
ND0287 # 11 Y:1997 11 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $89 $300 Not Implemented
ND0287 # 10 Y:1997 10 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $170 $0 Not Implemented
ND0287 # 09 Y:1997 09 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $269 $1,000 Not Implemented
ND0287 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $270 Not Implemented
ND0287 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $412 $400 Not Implemented
ND0287 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $133 Not Implemented
ND0287 # 05 Y:1997 05 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $791 $1,039 Not Implemented
ND0287 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $838 $75 Not Implemented
ND0287 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $922 $400 Not Implemented
ND0287 # 02 Y:1997 02 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,921 $2,000 Not Implemented
ND0287 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,628 $492 Implemented