IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
Reset
SIC 2064 Candy & Other Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0095 # 01 Y:1990 01 1990 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $6,294 $4,750 Implemented
WI0095 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,974 $500 Not Implemented
WI0095 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,889 $10,000 Not Implemented
WI0095 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $529 $400 Not Implemented
WI0095 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $276 $0 Implemented
WI0095 # 06 Y:1990 06 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $122 $141 Not Implemented
OK0301 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,177 $650 Not Implemented
OK0301 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $823 Implemented
OK0301 # 03 Y:1989 03 1989 OPTIMIZE PLANT POWER FACTOR $3,131 $6,000 Not Implemented
OK0301 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,277 $1,500 Implemented
OK0301 # 05 Y:1989 05 1989 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,774 $1,000 Not Implemented
CO0170 # 01 Y:1989 01 1989 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,370 $3,200 Not Implemented
CO0170 # 02 Y:1989 02 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $660 $500 Not Implemented
CO0170 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,760 $1,000 Implemented
CO0170 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,273 $3,850 Implemented
CO0170 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $776 Implemented
CO0170 # 06 Y:1989 06 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,670 $6,111 Not Implemented
CO0170 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,460 $1,000 Implemented
CO0170 # 08 Y:1989 08 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $750 Implemented
CO0170 # 09 Y:1989 09 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $440 $650 Not Implemented
CO0170 # 10 Y:1989 10 1989 INSULATE BARE EQUIPMENT $200 $140 Not Implemented
GT0394 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $109,711 $0 Implemented
GT0394 # 02 Y:1989 02 1989 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,141 $5,000 Not Implemented
GT0394 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,918 $6,340 Implemented
GT0394 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $647 $1,517 Implemented