IAC Assessment: GT0394
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0394
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1989
Principal Product STICK CANDY
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $10,000,000-$50,000,000
# of Employees 395
Plant Area (Sq.Ft.) 0
Annual Production 28,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $342,740 6,647,714 kWh $0.05
Natural Gas $68,004 14,605 MMBtu $4.66
Fuel Oil #2 $189,612 50,610 MMBtu $3.75
TOTAL ENERGY COSTS $600,356
RECOMMENDED SAVINGS* $120,786 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,645
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$109,711
Cost:
-
- - $109,711 - - - -
-
kWh
$109,711
-
MMBtu
-
-
MMBtu
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,141
Cost:
$5,000
- - $569 122 $1,572 426 -
-
kWh
$569
122
MMBtu
$1,572
426
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,918
Cost:
$6,340
$1,918 37,222 - - - - $1,918
37,222
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$647
Cost:
$1,517
- - $171 37 $476 129 -
-
kWh
$171
37
MMBtu
$476
129
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$260
Cost:
$1,060
$260 4,982 - - - - $260
4,982
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,109
Cost:
$7,140
- - $1,615 347 $4,494 1,218 -
-
kWh
$1,615
347
MMBtu
$4,494
1,218
MMBtu
TOTAL RECOMMENDED Savings:
$120,786
Cost:
$21,057
$2,178 42,204 $112,066 506 $6,542 1,773 $2,178
42,204
kWh
$112,066
506
MMBtu
$6,542
1,773
MMBtu
TOTAL IMPLEMENTED Savings:
$118,645
Cost:
$16,057
$2,178 42,204 $111,497 384 $4,970 1,347 $2,178
42,204
kWh
$111,497
384
MMBtu
$4,970
1,347
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2