IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 2064 Candy & Other Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0237 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,993 $2,764 Not Implemented
IC0237 # 03 Y:2020 03 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,125 $0 Not Implemented
IC0237 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,251 $2,864 Not Implemented
IC0237 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,275 $177 Not Implemented
IC0237 # 06 Y:2020 06 2020 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $817 $1,111 Not Implemented
IC0237 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $628 $200 Not Implemented
IC0237 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,797 $2,350 Not Implemented
WI0126 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,921 $865 Not Implemented
WI0126 # 01 Y:1991 01 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,767 $14,000 Not Implemented
WI0126 # 03 Y:1991 03 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $2,491 $10,000 Not Implemented
WI0126 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,563 $500 Not Implemented
WI0126 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $2,078 $1,600 Not Implemented
WI0126 # 07 Y:1991 07 1991 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $1,665 $0 Not Implemented
WI0126 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $533 $640 Not Implemented
WI0126 # 06 Y:1991 06 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $782 $0 Not Implemented
WI0126 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $810 $2,124 Not Implemented
WI0126 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $608 $0 Not Implemented
WI0095 # 01 Y:1990 01 1990 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $6,294 $4,750 Implemented
WI0095 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,974 $500 Not Implemented
WI0095 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,889 $10,000 Not Implemented
WI0095 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $529 $400 Not Implemented
WI0095 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $276 $0 Implemented
WI0095 # 06 Y:1990 06 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $122 $141 Not Implemented
WI0071 # 02 Y:1989 02 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,737 $0 Not Implemented
WI0071 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,005 $5,000 Not Implemented