IAC logo
IAC Assessment: WI0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product CHOCOLATE AND HARD CANDY
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 15,000,000 Pounds
Production Hrs. Annual 5,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $406,883 5,924,092 kWh $0.07
Natural Gas $131,748 49,797 MMBtu $2.65
TOTAL ENERGY COSTS $538,631
RECOMMENDED SAVINGS* $23,218 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$9,767
Cost:
$14,000
$10,326 150,352 $(-559) (-211) - - $10,326
150,352
kWh
$(-559)
(-211)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,921
Cost:
$865
$1,921 27,843 - - - - $1,921
27,843
kWh
-
-
MMBtu
-
-
$
03: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$2,491
Cost:
$10,000
- - $2,491 940 - - -
-
kWh
$2,491
940
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,563
Cost:
$500
- - $2,563 967 - - -
-
kWh
$2,563
967
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,078
Cost:
$1,600
- - $2,078 784 - - -
-
kWh
$2,078
784
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$782
Cost:
-
$782 11,430 - - - - $782
11,430
kWh
-
-
MMBtu
-
-
$
07: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$1,665
Cost:
-
$1,845 26,964 - - $(-180) - $1,845
26,964
kWh
-
-
MMBtu
$(-180)
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$810
Cost:
$2,124
$810 11,723 - - - - $810
11,723
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$608
Cost:
-
$608 8,792 - - - - $608
8,792
kWh
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$533
Cost:
$640
$533 7,620 - - - - $533
7,620
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,218
Cost:
$29,729
$16,825 244,724 $6,573 2,480 $(-180) - $16,825
244,724
kWh
$6,573
2,480
MMBtu
$(-180)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes