IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

389

matching recommendations
Reset
SIC 207 Fats And Oils
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2421 # 04 Y:2024 04 2024 INSTALL WIND POWERED ELECTRIC GENERATOR $148,851 $560,000 n/a
LS2421 # 01 Y:2024 01 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $33,742 $15,900 n/a
LS2421 # 03 Y:2024 03 2024 USE OTHER WASTE CONCENTRATION METHODS $590,512 $783,539 n/a
LS2421 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $8,504 $12,500 n/a
LS2421 # 05 Y:2024 05 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $21,228 $141,000 n/a
GT0975 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,668 $2,732 n/a
GT0975 # 04 Y:2024 04 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $39,992 $87,500 n/a
GT0975 # 01 Y:2024 01 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $442 $197 n/a
GT0975 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $1,334 n/a
GT0975 # 07 Y:2024 07 2024 MINIMIZE WATER USAGE $64,161 $237,800 n/a
GT0975 # 05 Y:2024 05 2024 REPAIR AND ELIMINATE STEAM LEAKS $770 $1,850 n/a
GT0975 # 06 Y:2024 06 2024 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $4,603 $11,665 n/a
MZ0347 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,827 $220 Not Implemented
MZ0347 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $3,495 $1,500 Not Implemented
MZ0347 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,034 $35,384 Implemented
MZ0347 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,018 $1,320 Not Implemented
MZ0347 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,683 $0 Implemented
MZ0347 # 06 Y:2023 06 2023 REPAIR AND ELIMINATE STEAM LEAKS $1,668 $380 Implemented
MZ0347 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,124 $22,000 Not Implemented
LE0540 # 06 Y:2023 06 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,386 $45,000 Not Implemented
LE0540 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $841 $1,040 Not Implemented
LE0540 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,247 $36,000 Not Implemented
LE0540 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,565 $11,000 Not Implemented
LE0540 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,521 $9,000 Not Implemented
LE0540 # 07 Y:2023 07 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $128,214 $580,000 Not Implemented