IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,566

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0733 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,370 $10 Implemented
AM0733 # 05 Y:2017 05 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,040 $0 Implemented
AM0733 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $260 $271 Implemented
AM0733 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,290 $1,720 Implemented
UU0115 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $296 $0 Implemented
UU0115 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $444 $438 Implemented
UU0115 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $0 Implemented
UU0115 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,766 $0 Implemented
AM0723 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $12,900 $23,700 Implemented
AM0723 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,600 $340 Implemented
AM0723 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,230 $2,500 Implemented
AM0723 # 05 Y:2017 05 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,380 $3,000 Implemented
AM0723 # 07 Y:2017 07 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,200 $0 Implemented
AM0723 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $4,350 Implemented
SF0494 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,238 $0 Implemented
SF0494 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $270 $0 Implemented
SF0494 # 03 Y:2016 03 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $5,772 $2,510 Implemented
SF0494 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,469 $4,948 Implemented
SF0494 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $567 $2,381 Implemented
SF0494 # 07 Y:2016 07 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $50,748 $406,834 Implemented
OR0678 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,663 $247 Implemented
OR0678 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $972 $2,626 Implemented
SF0491 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,425 $15,337 Implemented
MI0302 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,170 $29,740 Implemented
MI0302 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,840 $940 Implemented