IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,243

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0374 # 02 Y:1996 02 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,420 $2,240 Not Implemented
CO0374 # 03 Y:1996 03 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,270 $2,000 Implemented
CO0374 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $730 $830 Not Implemented
CO0374 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $570 $470 Not Implemented
CO0374 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60 $37 Implemented
UF0161 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,316 $7,288 Not Implemented
UF0161 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $491 $6,951 Implemented
UF0161 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $546 $500 Not Implemented
UF0161 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,132 $1,000 Implemented
UF0161 # 05 Y:1996 05 1996 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,171 $7,500 Not Implemented
UF0161 # 06 Y:1996 06 1996 TREAT AND REUSE RINSE WATERS $816 $865 Not Implemented
UF0161 # 07 Y:1996 07 1996 $11,375 $7,000 Implemented
DS0065 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $616 $11,156 Implemented
DS0065 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,358 $9,190 Implemented
DS0065 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $2,545 $2,161 Not Implemented
DS0065 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $812 $225 Not Implemented
DS0065 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $3,067 $683 Implemented
DS0065 # 06 Y:1996 06 1996 RECOVER AND REUSE COOLING WATER $2,576 $4,603 Not Implemented
DS0065 # 07 Y:1996 07 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $60,801 $21,060 Not Implemented
AS0187 # 01 Y:1996 01 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $81,742 $70,000 Not Implemented
AS0187 # 02 Y:1996 02 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $716 $1,750 Not Implemented
AS0187 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,717 $6,352 Implemented
AS0187 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,089 $1,421 Implemented
AS0187 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $0 Implemented
AS0187 # 06 Y:1996 06 1996 TREAT AND REUSE RINSE WATERS $17,828 $1,300 Implemented